• July

    1

    2016
  • 143
  • 0

Remove 2 walls and rebuild

Wall Removal Boise

FYI, If you know you house has this plaster wall coverings, allow for 3 times the time to demo walls.  It would have taken 4 times as long to build. Can you imagine nailing all those slats onto the walls and smearing it with plaster.

This house was built in 1929.

 

LEAVE A COMMENT

You comment will be published within 24 hours.

Cancel reply

COST CALCULATOR

Use our form to estimate the initial cost of renovation or installation.

REQUEST A QUOTE
Latest Posts
Most Viewed
Text Widget

Here is a text widget settings ipsum lore tora dolor sit amet velum. Maecenas est velum, gravida Vehicula Dolor

© Copyright 2016 REFURBISH BOISE